before YVW existed,
encasing a sewer under a slab-on-gound
the encasement was ::
ditchwitch down both sides of the pipe,
rebar arch over the pipe
foundation 36 inches deeper than the sewer either side of the trench
added around half a day to the foundation preparation time, and I dunno 51/2...