Scope out what your headworks cost will be. Ie Power, Sewer, Water, Gas.
For me the sewer turned into a biggy. Even tho it required no piping changes, beyond an internal T-junction inside property, I was charged 6k for each additional connection to the sewer line.
It's taken 4 months for a...