Search results

  1. Jake D

    Perth Bursting

    3D design & modelling, 2D drawings. Mostly earthworks, roads, drainage, sewer, water supply, some co-ordination of other services' locations. (I'm actually currently working in a structural group, doing 3D steel modelling, but I'm not a structural drafter and don't know what I'm doing. (Please...
  2. Jake D

    Perth Bursting

    Would love to. As soon as it's possible, I'm there.
  3. Jake D

    Perth Bursting

    I have been told by a transperth staffer that they physically can't have two trains on one section of track at once (ie, two trains between the same two stations) I reckon this will probably restrict the minimum time between trains to about 5 minutes. This could be misinformation, though.
  4. Jake D

    Perth Bursting

    It's a conundrum. The trains already run every 3-5 minutes at peak hour.
Back
Top