Search results

  1. Steve R

    Renovating Design for Maximum Profit

    In total just under 9 weeks. I was pretty fortunate with this one as i only lived around the corner. I virtually rolled out of bed and onto the driveway. MTR, you bring up another valid point that i have seen many times, not just in renovations but also new spec homes. Uneducated...
  2. Steve R

    Renovating Design for Maximum Profit

    Sorry MTR, typo, not MTJ
  3. Steve R

    Renovating Design for Maximum Profit

    I would share the figures MTJ, however i did the project as a JV with the owner of the property and I'm pretty sure they wouldn't want me to disclose their end of the deal. I can say the construction costs were relatively low considering the before and after result. Mainly due to light...
  4. Steve R

    Renovating Design for Maximum Profit

    Attached are before and after photos of a renovation/ extension I did in Mt Eliza, Vic. It was a pretty challenging job on a number of fronts. The double brick structure presented difficulties altering room sizes internally and externally and the original conventional roof system was under...
Back
Top