Search results

  1. H

    Aircon Installation - Body Corp Issue

    I think the electrician has been a bit slack. He should have taken his cable not on the lip of the concrete but back up to the roof of the stairwell and then run it along the corners back to the power box. The other conduit run may have put him off. Then at the power box he should have kept...
Back
Top