Search results

  1. jim1964

    Murray Bridge Rear Block Cut Off

    This is the end result. This is the End.
  2. jim1964

    Murray Bridge Rear Block Cut Off

    There was a small value loss of the existing properties identified in the new Vals,but the bank were happy to release the title to me,and not retain it for further security.I have calculated the loss will be made up within the next 6 months. :)
  3. jim1964

    Murray Bridge Rear Block Cut Off

    Ok,not a huge profit,but 2 to 3 of these a year................................................... THE END
  4. jim1964

    Murray Bridge Rear Block Cut Off

    Bump........................................The Finish. The Good !!!!! 1) The new block was valued at $80,000 The Bad !!! Costs. Surveyor $4125 SA Water $15673.52 DAC Open space fee $6488 DAC Land Division $1239.70 Original Surveyor (who i sacked) $550 50% Fencing Cost $1618...
  5. jim1964

    Murray Bridge Rear Block Cut Off

    Closer...............
  6. jim1964

    Murray Bridge Rear Block Cut Off

    We now have a water meter and a sewer point.Also received the bank val which was a touch lower than i anticipated.I will post up all the costs at the end............which is near.
  7. jim1964

    Murray Bridge Rear Block Cut Off

    LTO Deposited Plan.Not long now..................
  8. jim1964

    Murray Bridge Rear Block Cut Off

    The main serving lots 64 & 66 would have to be extended as well,as per Attch.
  9. jim1964

    Murray Bridge Rear Block Cut Off

    At Last. NO CONDITIONS!!! Happy Birthday to me......
  10. jim1964

    Murray Bridge Rear Block Cut Off

    I like trees,why cut them down if they can be incorporated into a build? Been online since 16/12/2013,my calculation works out at a touch over 3 months.Yes,there has been interest,have a handfull of people who are keen on offering when the TITLE is issued,which is fair enough.Plus the price is...
  11. jim1964

    Murray Bridge Rear Block Cut Off

    Contour Plan. Council have asked for a contour plan............Looks pretty technical. :confused:
  12. jim1964

    Murray Bridge Rear Block Cut Off

    Got this from SA Water today,showing where the sewer extension will be constructed.
  13. jim1964

    Murray Bridge Rear Block Cut Off

    http://tarabradford.net/wp-content/uploads/2013/03/beauty.jpg
  14. jim1964

    Murray Bridge Rear Block Cut Off

    Bump. Well it has been a bit quiet with this due to a few reasons,but some good news today SA Water have indicated the water point will cost $3611,this was as expected.The hiccup with this division was the Sewer needed to be extended to create a new IP point.Got the costing...
  15. jim1964

    Murray Bridge Rear Block Cut Off

    I guess the date shows it in real time.I was quoted $3300 in commission,plus $500 for online advertising,plus $300 file set up. WTF....its a block of land,not the taj mahal
  16. jim1964

    Murray Bridge Rear Block Cut Off

    http://www.realestate.com.au/property-residential+land-sa-murray+bridge-200767103 Here we go,now its time for business.Being a Tight @rse,thought i would have a go at selling myself.Cost me $120 to get this on Real Estate.Com
  17. jim1964

    Murray Bridge Rear Block Cut Off

    So far so good.The planners have indicated this will be fine,but non-complying which has a different set of rules which have to be addressed.They take the view that the square meters has been achieved (500),with a 13.7m frontage.To achieve a 15m frontage,it will throw the other 2 blocks areas...
  18. jim1964

    Murray Bridge Rear Block Cut Off

    Murray Bridge Bump Its all happening now!!!Now we start the selling stage,No more money will be spent on DA untill we have a contract.It cost me $1100 to clear the block,4 trips to the dump,through a mate of mine. May look at Sell By Owner ???????? Thoughts?????
  19. jim1964

    Murray Bridge Rear Block Cut Off

    PegPlan Looks good on paper.
  20. jim1964

    Murray Bridge Rear Block Cut Off

    How petty are some people.The former owners were too lazy to organise the yard to be cleaned up and the home cleaned before settlement,and asked me to organise this to be done. Today the bills come to me 1) $150 for yard clean up 2) $120 for full home clean. Emailed to owner who promptly asked...
Back
Top