I just dropped 2 large to replace a storage gas HWS like-for-like. I briefly considered changing it to an instantaneous system but I assumed it would take longer and cost more (to redo plumbing, fittings, etc). Was that a correct assumption?
From a long-term maintenance perspective, which...