Baulkham Hills Development

We have just commenced construction on our latest development in Baulkham Hills so I thought it is something worth sharing the details with my very good and supportive friends here on the forum.

Purchase:

DA approved site for 4 x 3 bedroom terraces (on a corner block and 3 levels) went for sale on the internet around June 2014 advertised offers over $950,000. I ascertained the DA and plans from the agent and crunched the numbers and it looked ok. I did not physically check out the site and replied on my old friend google maps.

The DD process took me a week (mainly because I was busy with work) and by the time I called the agent back the property was under offer.

I told the agent to keep me number handy in case the purchase fell through during off the cooling off period. Fast forward the following Friday ? I was driving to see a client and the agent called me at 10am and said the purchase fell through (ironically due to finance) and asked if I was interest in purchasing it. I told him to sit tight and I would be there in a few hours to sign the contract. So I did and signed the contract later in the day.

I purchased the site for $970,000. Later that week I went and saw the site and luckily its s beauty ? its perched on the high side of the street with a gorgeous outlook. I also went home and had to explain to my wife that I dropped $1mil on a property that I hadn?t seen yet (she was surprisingly understanding)

I requested for a 3 month delayed settlement so that I could have time lining up all my ducks (CC, construction, finance, etc). They accepted and we settled in August 2014.

I engaged Mflying from the forum to ascertain the CC for me and this took approximately 4 months due to the complexity in the project (it has Basement parking and thus added construction requirements).

We commenced construction in March due to the Christmas shut down period in the construction industry and adding more items in the building contract.

The construction is a lightweight construction (concrete transfer slab and timber floors) and lightweight cladding. The property is nicknamed ?Tribeca Townhomes? and as such the interiors have a very new york feel.

Numbers:

Purchase Price: $970,000
Stamps and Legals: $45,000
CC and s73: $50,000
Bank Fees: $5,000
s94: $10,000
Holding Costs: $75,000 (approx.)
Construction: $1,405,000 (including GST)

Total: $2,560,000

Resales @ $800,000: $3,200,000

Gross Profit @ $800,000: $640,000

Resales @ $900,000: $3,600,000

Gross Profit $900,000: $1,040,000

The resale numbers when we bought the property in August 2014 were $800k for each townhouses however comparable sales support a resale value of $900k.

Lessons Learnt (so far):

1. Project home builders do not do basement builds ? you will need to engage a private builder
2. Basement builds are particularly expensive as evident in the end cost. This is not just the basement itself but also added components such as HVAC systems, extra fire exits, etc)
3. It is really important to engage a good engineer to ensure that the structural and hydraulics are designed efficiently and are not going to cost a bomb to build.
4. You have to get your hands dirty and provide suggestions to design, construction and documentation. Don?t expect the professionals to get it right or to be proactive in providing solutions. Essentially question everything and its never a silly question.

I will add to this list as we go through the construction process as this is where a lot of issues come about.

Where to from here? Im already working on purchasing another site to move to as this one finishes up.
 

Attachments

  • Picture1 copy.jpg
    Picture1 copy.jpg
    86 KB · Views: 214
  • pic2.pdf
    277.2 KB · Views: 204
  • pic3.pdf
    88 KB · Views: 149
  • pic4.pdf
    376.2 KB · Views: 147
  • pic5.pdf
    86.8 KB · Views: 163
Looks great. Curious why you didn't make Unit 1 a 3 bedder? It appears there's enough space where the study is upstairs for a 3rd bedroom.
 
Looks great. Curious why you didn't make Unit 1 a 3 bedder? It appears there's enough space where the study is upstairs for a 3rd bedroom.

They are all 3 bedders - I just forgot to add the top floor.

The site has been cleared and ready for excavation (for the basement) this week.
 

Attachments

  • pic6.pdf
    51.4 KB · Views: 111
  • IMG_1036.jpg
    IMG_1036.jpg
    855.5 KB · Views: 157
Shahin, its wonderful when all the ducks line up, finance fell over, that's ironic.. numbers look good, perhaps even better on completion the way the Syd market is going.

All the best

MTR:)
 
We have just commenced construction on our latest development in Baulkham Hills so I thought it is something worth sharing the details with my very good and supportive friends here on the forum.

Purchase:

DA approved site for 4 x 3 bedroom terraces (on a corner block and 3 levels) went for sale on the internet around June 2014 advertised offers over $950,000. I ascertained the DA and plans from the agent and crunched the numbers and it looked ok. I did not physically check out the site and replied on my old friend google maps.

The DD process took me a week (mainly because I was busy with work) and by the time I called the agent back the property was under offer.

I told the agent to keep me number handy in case the purchase fell through during off the cooling off period. Fast forward the following Friday ? I was driving to see a client and the agent called me at 10am and said the purchase fell through (ironically due to finance) and asked if I was interest in purchasing it. I told him to sit tight and I would be there in a few hours to sign the contract. So I did and signed the contract later in the day.

I purchased the site for $970,000. Later that week I went and saw the site and luckily its s beauty ? its perched on the high side of the street with a gorgeous outlook. I also went home and had to explain to my wife that I dropped $1mil on a property that I hadn?t seen yet (she was surprisingly understanding)

I requested for a 3 month delayed settlement so that I could have time lining up all my ducks (CC, construction, finance, etc). They accepted and we settled in August 2014.

I engaged Mflying from the forum to ascertain the CC for me and this took approximately 4 months due to the complexity in the project (it has Basement parking and thus added construction requirements).

We commenced construction in March due to the Christmas shut down period in the construction industry and adding more items in the building contract.

The construction is a lightweight construction (concrete transfer slab and timber floors) and lightweight cladding. The property is nicknamed ?Tribeca Townhomes? and as such the interiors have a very new york feel.

Numbers:

Purchase Price: $970,000
Stamps and Legals: $45,000
CC and s73: $50,000
Bank Fees: $5,000
s94: $10,000
Holding Costs: $75,000 (approx.)
Construction: $1,405,000 (including GST)

Total: $2,560,000

Resales @ $800,000: $3,200,000

Gross Profit @ $800,000: $640,000

Resales @ $900,000: $3,600,000

Gross Profit $900,000: $1,040,000

The resale numbers when we bought the property in August 2014 were $800k for each townhouses however comparable sales support a resale value of $900k.

Lessons Learnt (so far):

1. Project home builders do not do basement builds ? you will need to engage a private builder
2. Basement builds are particularly expensive as evident in the end cost. This is not just the basement itself but also added components such as HVAC systems, extra fire exits, etc)
3. It is really important to engage a good engineer to ensure that the structural and hydraulics are designed efficiently and are not going to cost a bomb to build.
4. You have to get your hands dirty and provide suggestions to design, construction and documentation. Don?t expect the professionals to get it right or to be proactive in providing solutions. Essentially question everything and its never a silly question.

I will add to this list as we go through the construction process as this is where a lot of issues come about.

Where to from here? Im already working on purchasing another site to move to as this one finishes up.

Shahin - I know the site and it was a very good purchase likely to benefit from the explosion in prices due to the NW rail yet its not on the doorstep. One block away Dyldam are building a huge block of apartments. This area has exploded like Castle Hill did.

New York feel ?? You mean the road has no parking + the neighbours abuse you ?. :D Its also 100m to the pub and city direct buses. 1.0km from the M2.
 
Piers are in - excavation starts this week for the basement.

Had a 3 week delay due to the builder hitting an active water main which gave us a nice water feature.

Luckily I have built in a clause within the contract whereby I can charge the builder if they go over the agreed contract build period.
 

Attachments

  • Piers1.pdf
    3.6 MB · Views: 140
  • Piers2.pdf
    3.8 MB · Views: 123
Shahin I have noticed a glaring oversight in your design. There are no BMW's and Audi Q7's in the 3D render. How can you expect this development to be a success without them?
 
Hi Shahin,

Surely for a savvy investor like yourself, this was not luck, but wise planning?

I had this with put into my PPOR build contract, however most builders will tally up any and all excuses. My 2-storey PPOR was a 24 week build period and they scraped in at 23.57 weeks. They still had rain days and non-working days up their sleeve ( Xmas period ).

Just out of interest, what contract period did you sign them up to - just wondering how long a build like this takes from the construction certificate being issued.
 