From: Paddy in the Paddies
I've got a 1/4 acre in Essendon and want to start down the road of developing it. My questions are very basic (sorry) and at this point I need ballpark figures only.
What does it cost to demolish a 20sq double brick house ?
How long do plans often take to be approved ?
What would 3 x 16sq T/H cost to build ?
I assume there's a lot of time involved, so I want to get started planing now. I wish to keep them, so I would like quality, to give good vacancy and rent figures.
Where should I be starting ?
Keeping in mind that I'll be doing all this from abroad ?
Patosan
I've got a 1/4 acre in Essendon and want to start down the road of developing it. My questions are very basic (sorry) and at this point I need ballpark figures only.
What does it cost to demolish a 20sq double brick house ?
How long do plans often take to be approved ?
What would 3 x 16sq T/H cost to build ?
I assume there's a lot of time involved, so I want to get started planing now. I wish to keep them, so I would like quality, to give good vacancy and rent figures.
Where should I be starting ?
Keeping in mind that I'll be doing all this from abroad ?
Patosan
Last edited by a moderator: