Just wondering if people could give me estiamtes for build costs in 4114,
and my development fesability
Its a block with plans/permits for 7 townhouses
Build costs, $180k x 7=$1260
Council Contribution costs inc council fees: $224k
Engineers/site surveys: $100k
Misc: $30k
it was selling originally as a vacant block but the owners I assume have gone bust, and this work has been done,
1- Site cut and earthworks, removal of 15 trees and stumps
2- Civil works, storm water connection cross over the road in elkhorn st
Remove of old sewer line which ran under the 1st unit and re run the new line away from unit 1, this allowed us to build 7 units
3. RETAINING WALLS - Retaining walls to left side and rear and 50m to the right of property have been completed, as per engineering by STA Engineering, this was expensive as they have deep footings and also waterproofed on outerside
4. Fence to the left side has been completed
5. Drainage work to 3 units has been completed
6. Concrete slab to 3 units has been completed
7 water connection and meter has been installed and council fees paid.
8. Qleave paid
9. BSA insurance paid
10 Matris Certifier fee paid
can anyone tell me roughly a ball park figure of how much the above cost please???? and I assume this cost will be taken out of the $180x7=$1260
and my development fesability
Its a block with plans/permits for 7 townhouses
Build costs, $180k x 7=$1260
Council Contribution costs inc council fees: $224k
Engineers/site surveys: $100k
Misc: $30k
it was selling originally as a vacant block but the owners I assume have gone bust, and this work has been done,
1- Site cut and earthworks, removal of 15 trees and stumps
2- Civil works, storm water connection cross over the road in elkhorn st
Remove of old sewer line which ran under the 1st unit and re run the new line away from unit 1, this allowed us to build 7 units
3. RETAINING WALLS - Retaining walls to left side and rear and 50m to the right of property have been completed, as per engineering by STA Engineering, this was expensive as they have deep footings and also waterproofed on outerside
4. Fence to the left side has been completed
5. Drainage work to 3 units has been completed
6. Concrete slab to 3 units has been completed
7 water connection and meter has been installed and council fees paid.
8. Qleave paid
9. BSA insurance paid
10 Matris Certifier fee paid
can anyone tell me roughly a ball park figure of how much the above cost please???? and I assume this cost will be taken out of the $180x7=$1260