Hi All
Presently looking at installing gyprock ceilings in 5 units to cover up the vermiculite ceilings.
2 of the units are top story and we will just use the 64mm stud channels scewed through to the wood joists in the roof. Will need long screws as this is a fire rated ceiling with 2 layers of gyprock already in place.
This will closely follow the job as per utube clip
http://www.youtube.com/watch?feature=player_embedded&v=mVqkR_EXjgA
The other 3 units are vermiculite on concrete and as such will need a slightly different approach in the way the support system is attached to the ceiling.
All up it's about 260 sqm of gyprock etc.
Basically I am after a keenly priced gyprocker who will work with us to get the job done.
I will arrange to get all the material to each unit and they just need to come in throw up the railing system and then do the gyprocking and setting.
Cheers
Presently looking at installing gyprock ceilings in 5 units to cover up the vermiculite ceilings.
2 of the units are top story and we will just use the 64mm stud channels scewed through to the wood joists in the roof. Will need long screws as this is a fire rated ceiling with 2 layers of gyprock already in place.
This will closely follow the job as per utube clip
http://www.youtube.com/watch?feature=player_embedded&v=mVqkR_EXjgA
The other 3 units are vermiculite on concrete and as such will need a slightly different approach in the way the support system is attached to the ceiling.
All up it's about 260 sqm of gyprock etc.
Basically I am after a keenly priced gyprocker who will work with us to get the job done.
I will arrange to get all the material to each unit and they just need to come in throw up the railing system and then do the gyprocking and setting.
Cheers