Providing services to a subdivided lot

I'm going through the BCC Approval package and one condition is the connection of storm water pipes/connections . Would this have been done by QUU when connecting sewer/water or is storm water completely separate?

If separate, do I need to appoint a plumber to do this or is it more involved than this? The lot is currently vacant and a project build will commence in a few months. The lot with the existing house (ive split the block in two) is all sorted re storm water.
 
Sewer and stormwater are totally separate systems and never the two shall mix (serious fines apply).

This work is generally undertaken by a plumber.
 
Thanks Scott

So is it just the kerb adaptor I would need installed in prep for the project builder or is there pipe work that would need installing too?
 