Hey All,
Just some quick background. I am planning to subdivide my block and am toying with the idea of selling the vacant block as opposed to building on it as was originally planned.
I have DA approval for the second dwelling but have not yet begun the process of subdivision. I ideally want to do the bare minimum to allow it for sale and the purchases/builder can take care of the rest.
So I know for sure I need a surveyor, application to council and a rear fence dividing the properties but is there anything else? Do I also need to organise the connection of utilities in order to get the new title? Or is this only required for when you actually build.
I am trying to keep my costs as low as possible because if I am required to connect utilities including storm water before the new title is issued then I will likely proceed with the build myself.
Thanks in advance
Just some quick background. I am planning to subdivide my block and am toying with the idea of selling the vacant block as opposed to building on it as was originally planned.
I have DA approval for the second dwelling but have not yet begun the process of subdivision. I ideally want to do the bare minimum to allow it for sale and the purchases/builder can take care of the rest.
So I know for sure I need a surveyor, application to council and a rear fence dividing the properties but is there anything else? Do I also need to organise the connection of utilities in order to get the new title? Or is this only required for when you actually build.
I am trying to keep my costs as low as possible because if I am required to connect utilities including storm water before the new title is issued then I will likely proceed with the build myself.
Thanks in advance