Hi Albanga I suppose a building desginer/draftsman etc handled ur case? just wondering who they r? I wasnt successful in retaining both crossovers and had to remove one of it and had it changed to nature strip....(yes block I was trying to building next to the existing dwelling had two crossovers)
ok
I am in the situation ATM but different state
so according to my understanding that in the mean time ur insurance company wont pay the loss of rent until the tenant vacates so that means not until August in ur case? One will just have to keep paying the mortgage payment while receiving...
yup the property agent only deducted some cleaning n let them go n that was last December.
As u can see from my location I am in Melbourne and the property is in Rooty Hill so I am kind of just relying on the agent..
Just talked to teri scheer
she said its mostly not calm able under accident damage as this damage on the cupboard seemed to be a result from a gradual process rather than in one 'go'
.....
As per the title could ppl with recommend an agency or a particular agent in around Rooty Hill area plz?
The attached photos were sent to me by the handyman I sourced myself and this wasnt even mentioned on the exit report and when I queried the agent I am with now why they just let the...
the inspection report about the light switch is as the following
-Light switch to dining detached at wall
so I suppose it actually means re-attaching/screwing it back to the wall not actual 'wiring'??
HI all
I just got a quote from the PM to fix the followings $
-realign shower doors to ensuite and bathroom. Tighten rollers. Replace approx 2 rollers.
-dissemble ensuite sliding door frame to access roller to tighten and realign door so it can slide
-supply and rewire in a new 3 switch...
Hi all who has experience in building
Got some special conditions on the contract I just received
-Owners to arrange engineer/geotechnical interaction to confirm once trees have been removed to confirm the engineering drawings
And
-Owner to arrange an engineer to review structural drawing...
Finally all the permits and plans designs r ready and set for building which is the fun part:rolleyes:
Many thx for Oscar's work in getting this done and I am pretty sure that he can put any block no matter how weird it is through the council as he managed this one well:eek:
able to build a 3bed single storey building as well, just wondering how do u get those construction cost? did u get several quotes from builders already?