    Getting DA and cancelling the building contract

    These are the notes i have made for the general process. Is there anything thats really out of order? 1. One week later the preliminary (concept) designs are produced 2. 1-2 Weeks for revisions of concept design (if you change the design) 3. Organise underground power (green dome) from...
  2. T

    Getting DA and cancelling the building contract

    I will have to check my contract. So the drawings i have now for my other build and the drawings i expect soon from this 4 unit site (10 page document with elevations, layouts, every single dimension for walls/windows etc) is called Detailed or 'DA' drawings?
  3. T

    Getting DA and cancelling the building contract

    Its not contaimated fill but i assume the 40% increase still applies. I dont want to demolish just incase i cannot build a development site. There is a bylaw preventing me from developing but the builder has a verbal ok from the top planner for this development. He said he is very confident we...
  4. T

    Getting DA and cancelling the building contract

    Hi All Whats the process on getting Development Approval for a site and then deciding to onsell the DA instead of proceeding with building? Its been over 7 weeks and my builder still has not produced the working drawings that were promised to be delivered in 2 weeks and im down 8k. This...