Search results

  1. T

    Construction Costs and Stages

    11mths, Why do long,?
  2. T

    Construction Costs and Stages

    Thanks All, whats usually the time period between stages? Deposit ---6 Months -- Slab down: 12.5% -- 4 weeks-- Plate height: 28.5% -- 2 weeks -- Roof cover: 20% -- 6 weeks--- Lockup: 29% -- 3 months -- Practicle completion: 10% less deposit i.e Is it about 3 months from slab down...
  3. T

    Construction Costs and Stages

    Thanks, i thought it would be something a bit more standard like a 5 stage drawdown for everyday:-(
  4. T

    Construction Costs and Stages

    Does anyone have any information regarding the number of stages, the % cost of each stage and the duration of each stage during building a typical single storey 3x2 for a standard HIA contract in WA? eg I assume there are about 5 stages, not sure about the % cost of each stage and when they...
Back
Top