Does anyone have any information regarding the number of stages, the % cost of each stage and the duration of each stage during building a typical single storey 3x2 for a standard HIA contract in WA?
eg I assume there are about 5 stages, not sure about the % cost of each stage and when they are due.
Stage 1 : Slab Down: 20% total costs? Payable ~ 2 months after DA (due within 7 days of slab pour?)
Stage 2: Plate High : 40%?
Stage 3: ?
Stage 4: ?
Stage 5: Lockup : 10% costs? Payable 3 months after stage 4
Im trying to create a DCF analysis so see how much my holding costs will be during construction and how much money i will need each month.
Thanks!
eg I assume there are about 5 stages, not sure about the % cost of each stage and when they are due.
Stage 1 : Slab Down: 20% total costs? Payable ~ 2 months after DA (due within 7 days of slab pour?)
Stage 2: Plate High : 40%?
Stage 3: ?
Stage 4: ?
Stage 5: Lockup : 10% costs? Payable 3 months after stage 4
Im trying to create a DCF analysis so see how much my holding costs will be during construction and how much money i will need each month.
Thanks!