Well, the bricklayers start today on our small (257 sq metres) two storey PPOR in Perth. Anyone want to hazard a guess as to handover date??
Nope. The block is over 1000sqm, the house is double storey / triple in places going down the block and after the pool there ain't much garden... big garage though!
13mths is my guess.
Is that because you think there are shortages in the industry myf.
i thought builders always aimed at 6 months for a simple 4x2.
in saying that my slabs been down for ages and they are only half way through the bricks now. i hope it doesn't drag out to be a a year though !!
Thanks everyone for the input and the jokes! Builders said earliest would be February/March next year so I guess we'll see. Still can't get my head around why it takes so long for a simple two storey in WA. Seems crackers but I think that's just the way it is. Does anyone know if they generally pour the second floor slab? Seems strange to do it that way. Wouldn't it make more sense to use pre-cast?
I guessed that simply because it's a 2 storey and they take longer than a single storey.
They always pour the second floor slab. It would be too hard to do precast as there is so many plumbing/electrical/aircon ducts etc that are built into it.
The second floor slab cures for 4-6 weeks then they can lay the second storey bricks on it.