Hi,
I have the coolest asbestos garage (artistically painted on the inside); but the roof need replacement (rusty and leaking) in Newcastle.
The dimension is approximately 6m*4 m and It currently hass 6 m long roof sheeting on it.
A roofer quoted $1700 to remove the old roof + put on new sheet and new barge(the asbestor bit that covered the edge of the tin roof on both sides).
Is this reasonable?
I have only had one quote as it is almost impossible to get any tradies coming out at this time of the year.
Thanks
I have the coolest asbestos garage (artistically painted on the inside); but the roof need replacement (rusty and leaking) in Newcastle.
The dimension is approximately 6m*4 m and It currently hass 6 m long roof sheeting on it.
A roofer quoted $1700 to remove the old roof + put on new sheet and new barge(the asbestor bit that covered the edge of the tin roof on both sides).
Is this reasonable?
I have only had one quote as it is almost impossible to get any tradies coming out at this time of the year.
Thanks