Calling all chippies, professional and
amatuer alike. I'd like to ask your
advice on how to put down a timber
floor over a slab.
Specifically:
1. how far apart to space the batons
2. what material to use for the batons
3. how to correctly countersink the
heads of the dynabolts into the batons
Any discussion of the pros/cons of
different methods would be appreciated.
I'm planning to use Tasmanian Oak as
the flooring, it'll probably be around
70-80mm wide and 18mm thick. It
will be secret nailed by a pro, I figure
I can deal with the batons with a little
help from my Somersoft friends.
andy
amatuer alike. I'd like to ask your
advice on how to put down a timber
floor over a slab.
Specifically:
1. how far apart to space the batons
2. what material to use for the batons
3. how to correctly countersink the
heads of the dynabolts into the batons
Any discussion of the pros/cons of
different methods would be appreciated.
I'm planning to use Tasmanian Oak as
the flooring, it'll probably be around
70-80mm wide and 18mm thick. It
will be secret nailed by a pro, I figure
I can deal with the batons with a little
help from my Somersoft friends.
andy