For those that are interested.
It looks like the main road 92 project will be complete in about 2 months with only an 8 klm section left to go.
For those that dont know you basically have two options to get to the coast from Canberra( As all canberrans do each weekend it seems).
You head north east towards Sydney or you go the lower route via braidwood to Batemans bay. This has done wonders for Batemans bays growth over the years.
Now the link road has turned a dirt track into a sealed road between braidwood and Nowra.This should give some more positives to the shoalhaven property market by directing more people from the ACT into the area. The dirt track didnt allow this and was often limited to 4WD vehicles in wet weather. Property along the road has increased during the different stages of this roads creation although you can still get acres for quite cheap. Ad a sealed road and watch the prices go north.
A second look at the project and i cant confirm if the soon to be completed section is just Nowra to Nerriga or all the way to Braidwood. Either way its a very good thing.
Now connect this road to the shoalhaven and hopefully we will see upward pressure in the region also.
Cheers
http://www.rta.nsw.gov.au/constructionmaintenance/majorconstructionprojectsregional/southcoast/mr92/
Ok checked the site and it is the section from Nowra to Nerriga that is complete with Nerriga to Braidwood to follow. Not as good as being 100% complete but still very good for future growth of the area.
It looks like the main road 92 project will be complete in about 2 months with only an 8 klm section left to go.
For those that dont know you basically have two options to get to the coast from Canberra( As all canberrans do each weekend it seems).
You head north east towards Sydney or you go the lower route via braidwood to Batemans bay. This has done wonders for Batemans bays growth over the years.
Now the link road has turned a dirt track into a sealed road between braidwood and Nowra.This should give some more positives to the shoalhaven property market by directing more people from the ACT into the area. The dirt track didnt allow this and was often limited to 4WD vehicles in wet weather. Property along the road has increased during the different stages of this roads creation although you can still get acres for quite cheap. Ad a sealed road and watch the prices go north.
A second look at the project and i cant confirm if the soon to be completed section is just Nowra to Nerriga or all the way to Braidwood. Either way its a very good thing.
Now connect this road to the shoalhaven and hopefully we will see upward pressure in the region also.
Cheers
http://www.rta.nsw.gov.au/constructionmaintenance/majorconstructionprojectsregional/southcoast/mr92/
Ok checked the site and it is the section from Nowra to Nerriga that is complete with Nerriga to Braidwood to follow. Not as good as being 100% complete but still very good for future growth of the area.