Obviously for this couple with builder john Correnti the BSA has appeared to left them very frustrated.
Loud warning bells folks
This link has the whole story http://www.northlakes.com.au/Forums/tabid/61/aff/4/aft/3294/afv/topic/Default.aspx
Here is a summary
My wife and I have just built our latest house with Corden Homes, John Correnti, and we are absolutely disgusted with this man and his 'so called' Building company.
If we, like others alas, knew now what we know about him, we would have never even considered building with Corden. We hope that in some way by posting this, others may be saved from the hell we are still living in after 16 months from signing the contract.
The BSA will not do anything until the 6 month maintenance period is finished, even though we tried to get a BSA Inspector to come here to see extent of the Tier 1 Defective Work, and the Category 1 Defective Work, let alone the Category 2 Defects.
This so called Builder has ruined our lives, and we have now also been contacted by others who John has also treated poorly to say the least. We also found out that John had another company called Correnti Homes, in which he was issued demerit points and fined $4,000 by the BSA for failing to recitfy defective work, so he closed down that company and opened up as Corden Homes with a clean slate. How can the BSA just let people do this?
Obviously for this couple with builder john Correnti the BSA has appeared to left them very frustrated.
Loud warning bells folks
This link has the whole story http://www.northlakes.com.au/Forums/tabid/61/aff/4/aft/3294/afv/topic/Default.aspx
Here is a summary
My wife and I have just built our latest house with Corden Homes, John Correnti, and we are absolutely disgusted with this man and his 'so called' Building company.
If we, like others alas, knew now what we know about him, we would have never even considered building with Corden. We hope that in some way by posting this, others may be saved from the hell we are still living in after 16 months from signing the contract.
The BSA will not do anything until the 6 month maintenance period is finished, even though we tried to get a BSA Inspector to come here to see extent of the Tier 1 Defective Work, and the Category 1 Defective Work, let alone the Category 2 Defects.
This so called Builder has ruined our lives, and we have now also been contacted by others who John has also treated poorly to say the least. We also found out that John had another company called Correnti Homes, in which he was issued demerit points and fined $4,000 by the BSA for failing to recitfy defective work, so he closed down that company and opened up as Corden Homes with a clean slate. How can the BSA just let people do this?