Hi everyone,
I was wondering from people who have experience in this area - how long would you factor for the following reno. I'm trying to work out how long a project might take.
1. Remove old kitchen & install kitchen (straight line from Bunnings)
2. Upgrade bathroom with new toilet, sink, tiles (using a plumber)
3. Paint (airbrush?) inside 3 bedroom house
4. Carpet laid in house (professionally)
5. Paint (airbrush?) outside 3 bedroom house
Basically how quickly could all this realistically occur for a first time reno?
Thanks in advance
I was wondering from people who have experience in this area - how long would you factor for the following reno. I'm trying to work out how long a project might take.
1. Remove old kitchen & install kitchen (straight line from Bunnings)
2. Upgrade bathroom with new toilet, sink, tiles (using a plumber)
3. Paint (airbrush?) inside 3 bedroom house
4. Carpet laid in house (professionally)
5. Paint (airbrush?) outside 3 bedroom house
Basically how quickly could all this realistically occur for a first time reno?
Thanks in advance