Sarking has 2 purposes. If it is for insulation then batts would be the go If it is water proofing then you have to lift the tiles. for insulation you could run it vertically between trusses but that would be useless for moister and minimal advantage insulation wise. If it is for moister then you have to run it horizontally with a 200mm overlap
This has to be done at the time of construction.
I personally put sarking on all of our roofs, as i have seen way too many tiled roofs leak in good storms.
For the cost its a no brainer.