Hi,
Not sure if this guy is ripping me off, any indication would be appreciated, plus this fella has attitude:
Doing a renovation and managed now to get kitchen and bathroom fully ripped out...so a clean canvas.
Installation of New Toilet (excluding toilet itself), Install Shower Waste and Gas Hot Plate & Oven Installation (connection) $1,300 EX GST
New Cold Water Pipes (Front and Side) $2,200 EX GST
Total $3,500 EX GST
Thanks.
Not sure if this guy is ripping me off, any indication would be appreciated, plus this fella has attitude:
Doing a renovation and managed now to get kitchen and bathroom fully ripped out...so a clean canvas.
Installation of New Toilet (excluding toilet itself), Install Shower Waste and Gas Hot Plate & Oven Installation (connection) $1,300 EX GST
New Cold Water Pipes (Front and Side) $2,200 EX GST
Total $3,500 EX GST
Thanks.