As I've mentioned in a previous thread, I've bought a splitter block in Brisbane. There is a house currently on the block, which has a DA approval for subdivision straight down the middle. Titling can occur once the existing house is slid across the block.
I've appointed a draftsman, private certifier, engineer to deal with the plans/approvals for the existing house slide, but wondering what I need for the new block?
For the new block, I intend to appoint a project builder to build a standard 4x2 house on it. The new block requires its own sewer/water/electrical connections. Who do I appoint to do this? And does this all need to be arranged prior to getting a project builder involved?
I've appointed a draftsman, private certifier, engineer to deal with the plans/approvals for the existing house slide, but wondering what I need for the new block?
For the new block, I intend to appoint a project builder to build a standard 4x2 house on it. The new block requires its own sewer/water/electrical connections. Who do I appoint to do this? And does this all need to be arranged prior to getting a project builder involved?