Hi Folks.
I'm about to tile a bathroom floor. It's an older place with a cement slab as the substrate and I've removed all the existing mortar and tiles from the floor etc.
The only drainage point in the bathroom is in the shower alcove and I'm wondering basically if there is a standard gradient that should be used when screeding the mortar bed?
Or..... are the falls used only in the shower alcove and the rest of the bathroom better off just leveled?
Thanks (as I've got no idea with this stuff)....
ArJay