I will be looking to rent strata property that requires the bathroom to be ripped up some time in the future which looks like it will be 8 months+ when this happens.
the reason for this is that the building has had continued issues with water damaged as the bathrooms have not been water seal correctly. The immediate issue has been resolved so we don't have any issues right now but once the strata management has collected all the special levies required the work will then commence.
My question is, with this being a 1 bathroom unit and the expected work being out of a 6 month lease. Do I have to/should I disclose the required work to be done as this will result in the tenant not having a bathroom for two weeks if they are still there.
the reason for this is that the building has had continued issues with water damaged as the bathrooms have not been water seal correctly. The immediate issue has been resolved so we don't have any issues right now but once the strata management has collected all the special levies required the work will then commence.
My question is, with this being a 1 bathroom unit and the expected work being out of a 6 month lease. Do I have to/should I disclose the required work to be done as this will result in the tenant not having a bathroom for two weeks if they are still there.