For those that have complete developments through a small size builder - Did you get an itemised quote?
Ideally there are things I would like to get done by myself or a preferred contractor, such as the following:
Fencing
Landscaping
Paving
Insulation
Flooring
Painting
Is it normal for the builder to split these out? Or itemise the development costs? I am in Perth, WA.
I am aware that without them in the building contract, they will not be able to be financed. That is OK.
Ideally there are things I would like to get done by myself or a preferred contractor, such as the following:
Fencing
Landscaping
Paving
Insulation
Flooring
Painting
Is it normal for the builder to split these out? Or itemise the development costs? I am in Perth, WA.