whynot? 5th Sep, 2009 #1 Hi everyone, We had a go at renovating our bathroom so I thought I would share some photos. We expected the worst but thankfully didnt run into any dramas. Before Photos Attachments March 09 004.jpg 34.2 KB · Views: 176 March 09 005.jpg 31.5 KB · Views: 134 March 09 006.jpg 28.9 KB · Views: 128
Hi everyone, We had a go at renovating our bathroom so I thought I would share some photos. We expected the worst but thankfully didnt run into any dramas. Before Photos
whynot? 5th Sep, 2009 #2 Surprise Surprise! 2 layers of floor tiles??? The old cast iron bath was even heavier than we thought it would be. It took 4 men to get it out of the house. Attachments March 09 024.jpg 30.7 KB · Views: 142 March 09 049.jpg 29.6 KB · Views: 142 March 09 051.jpg 45 KB · Views: 141
Surprise Surprise! 2 layers of floor tiles??? The old cast iron bath was even heavier than we thought it would be. It took 4 men to get it out of the house.
whynot? 5th Sep, 2009 #3 The spa was installed, and the floor tiles went down. Attachments May 09 017.jpg 29.6 KB · Views: 131 May 09 035.jpg 33.5 KB · Views: 110 May 09 024.jpg 26.4 KB · Views: 143
whynot? 5th Sep, 2009 #4 New tapware, vanity and our old glass screen cleaned up and replaced Attachments May 09 027.jpg 19.5 KB · Views: 154 May 10 2009 011.jpg 20.1 KB · Views: 160 May 10 2009 012.jpg 19.3 KB · Views: 155
T The Fence 6th Sep, 2009 #6 Yep, looks good...do you mind telling what it cost please..? Did you do any of the work or all contractor...? Cheers!
Yep, looks good...do you mind telling what it cost please..? Did you do any of the work or all contractor...? Cheers!
whynot? 6th Sep, 2009 #7 The total cost was just over $5000 Plumber -$1200 Tiles $400 Tiler $2200 Spa - Free Tapware $200 Cabinet $500 We did the pull out on the Sunday and it was ready to use on the Friday. We still have to add a few hundred dollars for paint and a blind for the window.
The total cost was just over $5000 Plumber -$1200 Tiles $400 Tiler $2200 Spa - Free Tapware $200 Cabinet $500 We did the pull out on the Sunday and it was ready to use on the Friday. We still have to add a few hundred dollars for paint and a blind for the window.
V v770 25th Sep, 2009 #9 Hey there, Looks awesome! Mind if i asked how much would it cost had u left it all for the contractors to do the job? Also, was it noticeable when the bathroom had 2 layers of tiles prior to ur reno??