PART 2 of townhouse tart-up
We fixed up the rear courtyard.
The starting point was pretty awful....
...... then about 2.5 tonnes of dirt & bark, a crapload of bricks and blocks later.....
All costs added up.... probably around $1800.
This also includes buying a heap of paint, light fittings, light switches and bits and pieces to finish off the kitchen and interior, and painting a couple of new doors that strata fitted (old doors were rotten).
We fixed up the rear courtyard.
The starting point was pretty awful....
...... then about 2.5 tonnes of dirt & bark, a crapload of bricks and blocks later.....
All costs added up.... probably around $1800.
This also includes buying a heap of paint, light fittings, light switches and bits and pieces to finish off the kitchen and interior, and painting a couple of new doors that strata fitted (old doors were rotten).